Selamat datang di steelindonesia.com,  Daftar Masuk 
 
Beranda » Produk » Komponen bangunan dan struktur baja ›› Struktur Baja & Konstruksi Baja ›› Industri Berat ›› Anjungan Pengeboran Minyak
HESS - Ujung Pangkah Central Processing Platform (CPP) and Auxiliary & Utility Platform (AUP)

Hasil Pencarian

Semua Negara » Semua Provinsi » Semua Kategori Member » Semua Kategori (24)


Page 1 of 2 2 1

BALL VALVE Floating Ball Valves Model : 1 Piece, 2 Piece, 3 Piece Material Body : Cast Iron, A216 WCB, Stainles Steel Rating Standard : ANSI # 150, #300, #600, # 900 JIS 10K, 16K, PN 16, PN 40 Size : 1/2 MFG : KITZ, TOYO, KOLINK, GLT, GBA, GALA, ARITA, TOZEN.

PT.  kineta inti sejati
Kota Bekasi, Jawa Barat

BELLOW SEALS GLOBE VALVE PN 10, PN 16, PN MATERIAL BODY : CAST IRON, DUCTILE IRON, CARBON STEEL ( WCB ), ALLOY STEEL, FORGED STEEL MFG : GBA, GLT, KSB, VELAN, SPIRAX SARCO, KVC, SMITH, BONNEY FORGE, DOUGLAS CHERO, KITZ, ZETKAMA, GALA.

PT.  kineta inti sejati
Kota Bekasi, Jawa Barat

GLOBE VALVE RATING : ANSI #150, #300, #600, #900, #1500, #2500, JIS 10K, JIS 20K, 40K, PN 10, PN 16, PN 40 MFG : GBA, GLT, KSB, VELAN, SPIRAX SARCO, KVC, SMITH, BONNEY FORGE, DOUGLAS CHERO, KITZ, ZETKAMA, GALA.

PT.  kineta inti sejati
Kota Bekasi, Jawa Barat

GLOBE VALVE RATING : ANSI #150, #300, #600, #900, #1500, #2500, JIS 10K, JIS 20K, 40K, PN 10, PN 16, PN 40 MFG : GBA, GLT, KSB, VELAN, SPIRAX SARCO, KVC, SMITH, BONNEY FORGE, DOUGLAS CHERO, KITZ, ZETKAMA, GALA.

PT.  kineta inti sejati
Kota Bekasi, Jawa Barat

GLOBE VALVE : CAST IRON CARBON STEEL WCB A105, FORGED STEEL, RATING : ANSI #150, #300, #600, #900, #1500, #2500, JIS 10K, JIS 20K, 40K, PN 10, PN 16, PN 40 MFG : GBA, GLT, KSB, VELAN, SPIRAX SARCO, KVC, SMITH, BONNEY FORGE, DOUGLAS CHERO, KITZ, ZETKAMA, GALA.

PT.  kineta inti sejati
Kota Bekasi, Jawa Barat

Oil Rig Jobs

With the ability  to turn out products made with our own complete manufacturing equipment, we are able to produce an extensive range of  equipment for energy industry constructions. As an example, for the construction of an on-shore oil rig, we are able to manufacture approximately 70% of the construction. This is a very rare capability and is very often not possible by other companies of our type.

PT.  duta persada gemilang
,

Oil & Gas

Offshore Oil & Gas
Onshore Oil & Gas
Pipelines & Subsea System

PT.  nippon steel construction indonesia
Kota Administrasi Jakarta Selatan , Jakarta

GLOBE VALVE MATERIAL BODY : CAST IRON CARBON STEEL ( WCB ), FORGED STEEL, PRESSURE RATING : ANSI #150, #300, #600, #900, #1500, #2500, JIS 10K, JIS 20K, 40K, PN 10, PN 16, PN 40 MFG : GBA, GLT, KSB, VELAN, SPIRAX SARCO, KVC, SMITH, BONNEY FORGE, DOUGLAS CHERO, KITZ, TOYO, ZETKAMA, GALA, TOZEN

PT.  kineta inti sejati
Kota Bekasi, Jawa Barat

GATE VALVE Material Body : Carbon Steel, Stainless Steel, Forged Steel. RATING STANDARD : ANSI #150, #300, #600, #900. JIS 10K, 16K, 20K, PN 16, PN 40 Size : 1/2 - 24

PT.  kineta inti sejati
Kota Bekasi, Jawa Barat

HIGH PRESSURE GLOBE VALVE CARBON STEEL WCB A105 , ALLOY STEEL F11, F22, FORGED STEEL, STAINLESS STEEL RATING : ANSI #1500, #2500, PN 16, PN 40 MFG : GBA, GLT, KSB, VELAN, SPIRAX SARCO, KVC, SMITH, BONNEY FORGE, DOUGLAS CHERO, KITZ, ZETKAMA.

PT.  kineta inti sejati
Kota Bekasi, Jawa Barat

TUNU DEVELOPMENT - Oily Water Treatment Platform (OWT)

Total Indonesie E&P operates the Tunu gas and condensate field in East Kalimantan on the outer margin of the Mahakam delta with an average water depth of 8 m. Total has awarded Gunanusa to perform Engineering, Procurement, Construction and Installation of almost all of the phases of the development.

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

Maintenance and services

PT Indokomas Buana Perkasa is the partner of choice for companies and local authorities that seek to outsource management and execution of all maintenance and service activities.

We have been involved in long-term maintenance for electricity and instrumentation systems as well as heating, ventilating and air conditioning for the last 7 years. In the oil and gas industry we supply skilled manpower as well as procurement services to our customers.

In the field of services, our range on offer includes:

  • E&I commisioning work
  • E&I construction & commissioning supervision
  • Instrument calibration
  • On-call maintenance
  • Valve repair & conditioning
  • Plant turnaround

PT.  indokomas buana perkasa
Kota Administrasi Jakarta Timur , Jakarta

PECIKO DEVELOPMENT PHASE 3 - SATELLITE WELLHEAD PLATFORM (SWP-G)

For Peciko Offshore Developments Phase 3, Gunanusa fabricated the new Satellite Wellhead Platform (SWP-G) and 20" sea line connection SWP-G and the existing MWP-A, and also the modification to existing facility (MWP-A). The plant design life is 20 years. The construction and installation, completed in October,2002, include the deck (1200 tonnes) and jacket (800 tonnes).

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

Total - Tunu Field Development Phase 11 South Compression Platform and South Manifold Platform

Total E&P operates the Tunu gas and condensate field in East Kalimantan on the outer margin of the Mahakam delta with an average water depth of 8 m. Total has awarded Gunanusa to perform Engineering, Procurement, Construction and Installation of almost all of the phases of the development.

 

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

PTTEP- Quarter Platform South (QPS) and Flare Platform South (FPS)

PTT Exploration and Production Plc (PTTEP) operates the Greater Bongkot South (GBS) gas field in the Gulf of Thailand. For the Development Phase 4a of GBS, Gunanusa has been awarded the contract for Supply and Installation of Quarter Platform South (QPS) and Flare Platform South (FPS), with the scope of work to perform Engineering, Procurement, Construction, Installation, Hook Up and Commissioning.

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta
Page 1 of 2 2 1