HESS - Ujung Pangkah Central Processing Platform (CPP) and Auxiliary & Utility Platform (AUP)

Hasil Pencarian

Semua Negara » Semua Provinsi » Semua Kategori Member » Semua Kategori (13)



Oil & Gas

Offshore Oil & Gas
Onshore Oil & Gas
Pipelines & Subsea System

PT.  nippon steel construction indonesia
Kota Administrasi Jakarta Selatan , Jakarta

Oil Rig Jobs

With the ability  to turn out products made with our own complete manufacturing equipment, we are able to produce an extensive range of  equipment for energy industry constructions. As an example, for the construction of an on-shore oil rig, we are able to manufacture approximately 70% of the construction. This is a very rare capability and is very often not possible by other companies of our type.

PT.  duta persada gemilang
,

TUNU DEVELOPMENT - SISI NUBI Production Separation (SNPS)

Sisi Nubi Production Separation Platform (SNPS) has a 12 legs 3500 tonnes intergrated topside including finger type slug catcher separator, pipe racks, pig receiver, and open/close drain drum.

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

TUNU DEVELOPMENT PHASE 8 - North Compression Platform (NCP)

The North Compression Platform for Tunu Development Phase 8, weighing at 5400 tonnes, is the largest platform Gunanusa ever fabricated to date. The NCP would allow the North Tunu area to operate in MP mode. The platform comprises of inlet slug catcher, air cooler, condensate export pumps and turbo-compressors. The project was completed in September, 2002.

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

Total - Tunu Field Development Phase 11 South Compression Platform and South Manifold Platform

Total E&P operates the Tunu gas and condensate field in East Kalimantan on the outer margin of the Mahakam delta with an average water depth of 8 m. Total has awarded Gunanusa to perform Engineering, Procurement, Construction and Installation of almost all of the phases of the development.

 

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

Total - Peciko 6

Total E&P operates the Peciko gas and condensate field at the offshore of East Kalimantan, with a water depth from 30m to 50m, south of the Mahakam River Delta. Peciko Development Phase 6 is an onshore project consisted of turbo-compressors, inlet and discharge gas air coolers, suction and discharge scrubbers, pressure vessels, accompanying pipelines and civil works. The project will took 21 months and will be completed in 4th quarter of 2009.

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

PTTEP- Quarter Platform South (QPS) and Flare Platform South (FPS)

PTT Exploration and Production Plc (PTTEP) operates the Greater Bongkot South (GBS) gas field in the Gulf of Thailand. For the Development Phase 4a of GBS, Gunanusa has been awarded the contract for Supply and Installation of Quarter Platform South (QPS) and Flare Platform South (FPS), with the scope of work to perform Engineering, Procurement, Construction, Installation, Hook Up and Commissioning.

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

PECIKO DEVELOPMENT PHASE 3 - SATELLITE WELLHEAD PLATFORM (SWP-G)

For Peciko Offshore Developments Phase 3, Gunanusa fabricated the new Satellite Wellhead Platform (SWP-G) and 20" sea line connection SWP-G and the existing MWP-A, and also the modification to existing facility (MWP-A). The plant design life is 20 years. The construction and installation, completed in October,2002, include the deck (1200 tonnes) and jacket (800 tonnes).

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

ONGC - ICP-R PLATFORM

The project scope of works is the Engineering, Procurement, Construction, Commissioning and Installation of the ICP-R platform, Flare Tripod and connecting bridge. The ICP-R platform consist Main Structural Frame, Building Module, Process Module, Turbo Generator and Compressor Module which has a weight of 7300 MT and the jacket weight is 3600 MT. The Flare Tripod topside weight is 90 MT and the jacket is 630 MT.The water depth is 75 m.

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

PECIKO DEVELOPMENT PHASE 4 - Satellite Wellhead Platforms

Peciko Offshore Development Phase 4 EPSC 2 contract entails the fabrication of 2 satellite wellhead platforms with 4 legs (SWP E & K), the decks weight are 970 and 850 tonnes. The jacket for the decks are 800 and 720 tonnes.

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

BP Tangguh Gas Production Facilities

The BP Indonesia operates Tangguh gas field in Berau Bay in the province of Irian Jaya, Indonesia. The natural gas field contains over 500 billion m3 (17 Tcf) of proven natural gas reserves, with estimates of potential reserves reaching over 800 billion m3 (28 Tcf).

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

TUNU DEVELOPMENT - Oily Water Treatment Platform (OWT)

Total Indonesie E&P operates the Tunu gas and condensate field in East Kalimantan on the outer margin of the Mahakam delta with an average water depth of 8 m. Total has awarded Gunanusa to perform Engineering, Procurement, Construction and Installation of almost all of the phases of the development.

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta

HESS - Ujung Pangkah Central Processing Platform (CPP) and Auxiliary & Utility Platform (AUP)

Hess operates the Ujung Pangkah area at East Java in shallow water at 10 m depth. Gunanusa has been awarded to perform Engineering, Construction, Hook Up and Commissioning of Central Processing Platform (CPP) and Auxiliary & Utility Platform (AUP).

PT.  gunanusa utama fabricators
Kota Administrasi Jakarta Pusat, Jakarta